Difference between revisions of "Group 1: Net-Zero Retro-commissioning"

From Greening of Aiken
Jump to: navigation, search
 
Line 7: Line 7:
 
3) Compare data from old reports and determine if we can make similar changes.
 
3) Compare data from old reports and determine if we can make similar changes.
  
 +
[[Aiken Center]]
  
Click [[File:UVM Bittersweet_Burlington Electric_EnergySummary_2019-01-09|here]] for Burlington Electric's energy summary of the BIttersweet building.
+
[[Bittersweet]]
 +
 
 +
[[Forestry Science Lab]]
 +
 
 +
[[Rubenstein Lab]]

Latest revision as of 15:52, 4 February 2019

Goals:

1) Retro-commissioning RESNR buildings and determining potential cost and energy savings that can be achieved. Figuring out how we can use RESNR buildings more efficiently without upgrades.

2) Determining how much energy RESNR buildings will use after achievable upgrades are made.

3) Compare data from old reports and determine if we can make similar changes.

Aiken Center

Bittersweet

Forestry Science Lab

Rubenstein Lab