2020
Contents
ENSC 195 Spring 2020 meets **Thursday at 6:00-9:00 PM in Aiken 311**
Spring 2020 Group Homepages
Group 1: insert name here
Finish the final phase to move RESNR buildings to Net-Zero ready.
Group 2: insert name here
Determine energy use of RESNR building to be offset by renewable solar energy and work with UVM personnel to finalize potential arrangements to install solar panels to offset energy use of RESNR buildings.
Group 3: insert name here
Quantify renewable energy needed to offset carbon emissions from business travel of RESNR faculty and staff.
Group 4: insert name here
Aiken solarium upgrade and maintenance, Green Roof measurements and maintenance and advance Aiken Stormwater to Flush Toilets project
All Groups: 3-Credit Requirements Page
Miscellaneous
File:Uvm schooldude tutorial 09-2016.pdf
File:Building square footage.xls
Link to energy usage data for campus buildings:
http://www.uvm.edu/sustain/cef/about/building-energy-use-data
Archive: "Energy Evaluation Page" <= linked right here
Aiken Center Dashboard: http://buildingdashboard.com/clients/uvm/aiken/
RSENR's 17 Solar Trackers at the FS Lab: http://www.allearthrenewables.com/energy-production-report Site ID: 282